Metro Coverage
Built block by block,
building by building.
Every pin is a property we've kept running. Every card is a job already done in your neighborhood.


Midtown Marquis
8th Ave & W 44th St
Emergency riser failure — floors 6–12 repressurized and re-valved in one overnight shift. Guests asleep on 7 the whole time.
The Lexington Grand
Lexington Ave & E 51st St
Full lobby bathroom gut and repipe — Tuesday 11 AM checkout to Friday 8 AM opening. New copper supply, PVC drain, ADA-compliant fixtures.

SoHo Loft Hotel
Mercer St & Spring St
Burst pipe at 2:47 AM — third-floor supply line. On-site in 41 minutes. Water isolated, pipe replaced, drywall patched before morning coffee service.
Chelsea Arms
W 23rd St & 7th Ave
Scheduled quarterly maintenance — 178 shutoff valves exercised, 14 replaced, PRV reset, and full hot-water recirculation balance.
What We Handle
Every scenario,
already solved.

47 min
Avg. on-site response
Emergency Response
A burst pipe at 3 AM is not a morning problem. We are dispatched before your chief engineer finishes the call.
Riser failures · burst supply lines · drain backups · pressure loss · boiler feed failures. If it is wet and it should not be, we close it.

200+
Risers replaced
Riser Replacement
Corroded risers do not announce themselves until they fail at the worst possible moment.
We map your stack, schedule floor-by-floor isolation, and replace galvanized with copper or CPVC without a single unscheduled outage.
68 hrs
Fastest lobby repipe
Renovation Piping
Tuesday checkout to Friday check-in. We gut, repipe, and restore — on the schedule your GM printed.
Lobby bathrooms · guest room clusters · kitchen rough-ins. Full scope, zero surprises.

Scheduled Maintenance
The valve that seizes is the one nobody exercised for three years.
178
Valves exercised per visit
From the Field
Chief engineers
say it plainest.
"They were on-site before I finished filing the maintenance request. Riser on floors 8 through 14 was isolated, repaired, and back in service before the 6 AM breakfast rush. Nobody on the floor ever knew."
Marcus Delgado
Chief Engineer
Midtown Marquis Hotel
6 hrs
Total downtime
Certifications
The guest in 714 should never
know we were there.
Whether you're managing a portfolio of flagged properties, fielding an emergency call right now, or planning a lobby renovation around your booking calendar — we've already handled your exact problem at a building three blocks away.
NYC Licensed Master Plumber · Bonded & Insured · Available 24/7/365
